
TCL are proud to have been associated with the Channel Tunnel Rail Link project at St. Pancras, London
TCL gain OHSAS 18001 accreditation...
TCL attained ISO14001 on June 21st 2007
TCL is delighted to announce the recent award of six major projects for 2008.
Please see below for our Commercial case studies :
Design supply and installation of various dry-lining systems, shaft-walls, metal stud partitions and fire protection systems.
Design supply and installation of plasterboard partitions, specialist suspended ceilings and dry-lining systems including design development
Design supply and installation of raised access flooring, metal ceiling systems and acoustically rated metal partition systems
Design supply and installation of plasterboard partitions, specialist suspended ceilings and dry-lining systems including design development
Design supply and installation of plasterboard partitions and dry-lining systems including design development
Design supply and installation of various suspended ceiling and dry-lining systems, metal stud partitions, shaft-wall systems columns and bulk heads